MegaGlest Forum
MegaGlest => Feature requests => Topic started by: Coldfusionstorm on 11 December 2014, 00:46:15
-
yeah so basically if a worker leaves a building while working on it the build process is canceled.
Im asking for that a worker can resume the build again. This can be very annoying as repair speed and build speed can be VERY different so that it takes ALOT of time while your worker is tied up "building" a building to full healh.
[im aware there is a beta release soon, so im asking for it after beta]
-
Well, we do have to note that the repair speeds are often purposefully lower than build speeds to slow down the building speed when using multiple workers (in which case only one work is actually building and the rest are repairing). So to retain this behavior, only one worker should be able to resume building.
-
I agree, Only one worker should be able to build at a time.
-
yes, this is annoying sometimes.